by dev-samson | Nov 7, 2024
The RM of Dufferin experienced a flood event in the spring of 2022 and as a result, the Abbott Bridge, a 5-span timber bridge, sustained significant damage. Samson was contracted to Design and Build the replacement crossing of a three span, 90’ long, 28’ wide CL-625...
by dev-samson | Nov 7, 2023
The Municipality retained Samson to conduct a Topographic Survey, Hydraulic Study, and preliminary planning regarding a replacement structure for this site. Following completion of the studies and preliminary planning, Samson was contracted to Design and then Build...
by dev-samson | Nov 7, 2022
Samson completed a feasibility study in order to assist the Town in determining which wastewater system would be the most efficient and provide the capacities needed to meet the Town’s future requirements. Samson’s scope of work included a documentation review,...
by dev-samson | Nov 7, 2022
The McCauley Crossing, located in the Rural Municipality of Moose Creek No. 33, SK, was a collapsed low concrete level crossing that has been closed to traffic since 2011. Samson was contracted to Design and Build the replacement crossing of a clear span, 60’ long 28’...