Samson successfully delivered design, contract administration, and construction phase services for three bridge replacements at Rolling River First Nations in Manitoba. The scope included legal and topographic surveys, geotechnical investigations, hydraulic studies, and full engineering design and drawings for the new structures. Each bridge was replaced with a 28 ft wide, 80 ft long clear-span CL-625 load-rated steel structure, supported by steel deep pile foundations and reinforced concrete backwalls and wingwalls. The project ensures improved safety, durability, and compliance with current standards. Construction was completed during the 2024 season.