by Rus Dow | Dec 10, 2024
Samson successfully delivered design, contract administration, and construction phase services for three bridge replacements at Rolling River First Nations in Manitoba. The scope included legal and topographic surveys, geotechnical investigations, hydraulic studies,...
by dev-samson | Nov 7, 2024
The RM of Dufferin experienced a flood event in the spring of 2022 and as a result, the Abbott Bridge, a 5-span timber bridge, sustained significant damage. Samson was contracted to Design and Build the replacement crossing of a three span, 90’ long, 28’ wide CL-625...
by dev-samson | Nov 7, 2023
The Municipality retained Samson to conduct a Topographic Survey, Hydraulic Study, and preliminary planning regarding a replacement structure for this site. Following completion of the studies and preliminary planning, Samson was contracted to Design and then Build...
by dev-samson | Nov 7, 2022
The McCauley Crossing, located in the Rural Municipality of Moose Creek No. 33, SK, was a collapsed low concrete level crossing that has been closed to traffic since 2011. Samson was contracted to Design and Build the replacement crossing of a clear span, 60’ long 28’...
by Rus Dow | Dec 17, 2019
The Minshull Bridge, located in the Municipality of Two Borders, was deteriorated and damaged by previous flooding events. Samson was contracted to Design and Build the replacement of the crossing with a new CL-625 load-rated steel and concrete bridge. The scope of...